4.7 Article

Joint optimization of a flow-shop group scheduling with sequence dependent set-up times and skilled workforce assignment

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 52, 期 9, 页码 2696-2728

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2014.883469

关键词

flow-shop; group scheduling; workforce assignment; linear programming; skills; genetic algorithms

向作者/读者索取更多资源

Flow-shop sequence-dependent group scheduling (FSDGS) problem has been extensively investigated in the literature also due to many manufacturers who implemented the concept of group technology to reduce set-up costs, lead times, work-in-process inventory costs, and material handling costs. On the other hand, skilled workforce assignment (SWA) to machines of a given shop floor may represent a key issue for enhancing the performance of a manufacturing system. As the body of literature addressing the group scheduling problems ignored up to now the effect of human factor on the performance of serial manufacturing systems, the present paper moves in that direction. In particular, an M-machine flow-shop group scheduling problem with sequence-dependent set-up times integrated with the worker allocation issue has been studied with reference to the makespan minimization objective. First, a Mixed Integer Linear Programming model of the proposed problem is reported. Then, a well-known benchmark arisen from the literature is adopted to carry out an extensive comparison campaign among three properly developed metaheuristics based on a genetic algorithm framework. Once the best procedure among those tested is selected, it is compared with an effective optimization procedure recently proposed in the field of FSDGS problems, being this latter properly adapted to run the SWA issue. Finally, a further analysis dealing with the trade-off between manpower cost and makespan improvement is proposed.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据