4.7 Article

Models and optimisation approaches for scheduling steelmaking-refining-continuous casting production under variable electricity price

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 52, 期 4, 页码 1032-1049

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2013.828179

关键词

steelmaking-refining-continuous casting; variable electricity price; mathematical programming; constraint propagation; heuristic algorithm

向作者/读者索取更多资源

This paper studies the steelmaking-refining-continuous casting (SRCC) scheduling problem with considering variable electricity price (SRCCSPVEP). SRCC is one of the critical production processes for steel manufacturing and energy intensive. Combining the technical rules used in iron-steel production practice, time-dependent electricity price is considered to reduce the electricity cost and the associate production cost. A decomposition approach is proposed for the SRCCSPVEP. Without considering the electrical factor, the first phase applies the mathematical programming method to determine the relative schedule plan for each cast. In the second phase, we formulate a scheduling problem of all casts subject to resource constraint and time-dependent electricity price. A heuristic algorithm combined with the constraint propagation is developed to solve this scheduling problem. To investigate and measure the performance of the proposed approach, numerous instances are randomly generated according to the collective data from a well-known iron-steel plant in China. Computational results demonstrate that our algorithm is very efficient and effective in providing high-quality scheduling plans, and the electricity cost can be reduced for the iron-steel plant.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据