期刊
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 50, 期 23, 页码 6763-6774出版社
TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2011.623838
关键词
buffer sizing; inventory control; maintenance scheduling
This paper deals with an imperfect production system with allowable shortages due to regular preventive maintenance for products sold with free minimal repair warranty. Preventive maintenance is an essential factor of the just-in-time structure that results in a shutdown of the production process for a certain period of time. During such an interruption, a buffer stock is needed to adjust the market demand. The study includes the possibility of imperfect production and determines the optimum buffer level and production run time by trading off the holding cost, shortage cost, rework cost, repair cost for warranty, labour/energy costs, material cost and cost for maintenance so that the cost per unit product is minimised.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据