4.7 Article

Using the when/where rules in dual resource constrained systems for a hybrid push-pull control

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 47, 期 6, 页码 1661-1677

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207540701579530

关键词

dual resource constrained; hybrid push-pull; production control; bottleneck management

向作者/读者索取更多资源

This paper proposes a production control system, DRC-HPP, which uses the when/where rules in dual resource constrained (DRC) systems for a hybrid push-pull (HPP) control, to overcome some difficulties in modelling/implementing DRC/Kanban systems. These rules and the novel 'process-or-transport' and 'whereto' rules are embedded in some policies workers use to decide when to process (transport) parts, and where (whereto). Unlike most control systems, in which a group of workers is always responsible for transporting and another group is always responsible for processing parts, workers in DRC-HPP are responsible for both transporting and processing parts, as in the Toyota Sewn Products Management System (TSS). Yet, unlike TSS, DRC-HPP can be applied in any layout type. Workers transport parts when they are idle in part processing to enhance their utilisations and synchronise transportation. Since the transportation does not require special worker skills, the cost of training workers is not incurred. DRC-HPP is compared with different benchmarks through simulation experiments to evaluate its performance. It performs well under relatively short transportation times with respect to processing times. If they are relatively longer, the issue becomes to determine the number of workers to achieve a performance level. DRC-HPP also facilitates bottleneck management.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据