4.6 Article

Rolling stock maintenance strategy selection, spares parts' estimation, and replacements' interval calculation

期刊

出版社

ELSEVIER
DOI: 10.1016/j.ijpe.2010.07.038

关键词

Rolling stock maintenance; Maintenance strategy; Spare parts; Replacement interval

向作者/读者索取更多资源

The purpose of this paper is to permit an approach for: (1) selecting a maintenance strategy for rolling stock and (2) obtaining possible spare parts' quantities and replacement intervals for the components of rolling stock. The methodology adopts an analytic network process (ANP) technique for the strategy evaluation, because ANP considers the important interactions among evaluation factors. The ANP's result decides upon a proper rolling stock maintenance strategy formed by various combinations of preventive maintenance (PM) and corrective maintenance (CM). The ratio PM/CM, obtained by ANP, can help to predict spare parts' quantities of the components of rolling stock. The empirical result also indicates that preventive maintenance should be much more valued than corrective maintenance. In addition, safety is considered the most crucial factor for the selection of a rolling stock maintenance strategy. The fruit of this study serves as a reference for railway system operators when evaluating their rolling stock maintenance strategy and also when estimating their spare parts' quantities and replacement intervals for specific components of the rolling stock. (C) 2010 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据