4.6 Article

A continuous model for supply planning of assembly systems with stochastic component procurement times

期刊

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ijpe.2008.11.015

关键词

Assembly-to-order; Random lead-times; Supply planning; Optimization; Simulated annealing

向作者/读者索取更多资源

This paper studies a customized product assembly scenario where some components cannot be stocked due to high component cost and risk. We consider the case where these key components are ordered after a demand has been registered with a promised delivery date. Component lead-times are stochastic and associated distribution function is known in advance. The objective is to determine the ordering time for each component such as to minimize the sum of expected holding and backlogging costs. An approach to solve this problem is proposed and the algorithm is tested on a randomly generated data set. (C) 2009 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据