INTERNATIONAL JOURNAL OF PHYTOREMEDIATION
卷 14, 期 9, 页码 861-877出版社
TAYLOR & FRANCIS INC
DOI: 10.1080/15226514.2011.628879
关键词
economics; site clean-up; hydrogeological modelling; BTEX
In 1999, phytoremediation was applied at the site of a Belgian car factory to contain two BTEX plumes. This case study evaluates the cost effectiveness of phytoremediation compared to other remediation options, applying a tailored approach for economic evaluation. Generally, when phytoremediation is addressed as being cost effective, the cost effectiveness is only determined on an average basis. This study however, demonstrates that an incremental analysis may provide a more nuanced conclusion. When the cost effectiveness is calculated on an average basis, in this particular case, the no containment strategy (natural attenuation) has the lowest cost per unit mass removed and hence, should be preferred. However, when the cost effectiveness is determined incrementally, no containment should only be preferred if the value of removing an extra gram of contaminant mass is lower than (sic)320. Otherwise, a permeable reactive barrier should be adopted. A similar analysis is provided for the effect determined on the basis of remediation time. Phytoremediation is preferred compared to 'no containment' if reaching the objective one year earlier is worth (sic)7 000.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据