4.6 Article

A new approach for optimal sizing of battery energy storage system for primary frequency control of islanded Microgrid

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ijepes.2013.07.005

关键词

Microgrid; Battery energy storage system (BESS); Overloading characteristic; Microsources; Primary frequency control

向作者/读者索取更多资源

This paper presents a method for determining optimal size of a battery energy storage system (BESS) for primary frequency control of a Microgrid. A Microgrid is assumed to be portion of a low voltage distribution feeder including sources such as microturbine, diesel generator, fuel cell and photovoltaic system with slow response for frequency control. A BESS due to its very fast dynamic response can play an important role in restoring balance between supply and demand. In this paper, overloading capacity of the BESS is employed for fast handling of the primary frequency control of a MG. To achieve this purpose, by considering overloading characteristics and limitations of the state of charge (SOC) of battery, a control scheme of dc/ac converter for the BESS is developed. Based on this scheme, overloading capacity of the BESS and its permissible duration for participating in primary frequency control is determined. Simulation studies are carried out using PSCAD/EMTDC software package to evaluate the performance of the proposed control scheme. (C) 2013 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据