IEEE TRANSACTIONS ON RELIABILITY
卷 57, 期 1, 页码 134-139出版社
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TR.2007.909775
关键词
availability; inventory management; joint optimization; maintenance; spare parts
A joint preventive maintenance and spare parts provisioning strategy is suggested for a failure prone system. Replacements are carried-out at failure, if spare parts are available, and at spare parts replenishment delivery instants. Spare parts are provisioned according to an (s, Q) control policy. The ordering parameters, and preventive maintenance interval are derived from a mathematical model which aims at maximizing the system's availability under a budget constraint. The model takes into account the system lifetime distribution, the preventive and corrective maintenance costs and durations, as well as the total spare parts inventory management cost. Unlike classical inventory management models, the s-expected total cost is derived using the system lifetime distribution. Because each demand for spare parts is triggered by failure, the probabilities of shortage, and surplus will be evaluated based on the system failure distribution rather than the demand distribution during the lead-time. Numerical results have been obtained for an illustrative example.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据